Skip to content

Draft: Resolve "Improve Practical Guide DPA Contest"

Joseph de Soissan requested to merge 47-improve-practical-guide-dpa-contest into master

Approval checklist:

  • Related issue, documented and qualified
  • The development is finished (pipeline passing) and include new or modified tests
  • Docstrings have been updated if needed
  • Documentation is updated if relevant
  • A commit message following conventional commit is proposed by the submitter for merge message in the master
  • Approval by one of the maintainer is obtained

Closes #47

Edited by Joseph de Soissan

Merge request reports